Navigating NYC Streets: What Roads Are Closed Today? Your Daily Guide

New York City, the city that never sleeps, is also a city that’s constantly evolving. Whether it’s planned construction, essential maintenance, or vibrant city events, street closures are a regular part of the NYC landscape. For residents, commuters, and visitors alike, knowing which streets are closed is crucial for smooth navigation and avoiding unnecessary delays. Streetsounds.net is your go-to source for the most up-to-date information on street closures in NYC, ensuring you can plan your day and travel efficiently across Manhattan, Bronx, Brooklyn, Queens, and Staten Island.

Manhattan Street Closures

Navigating Manhattan can be challenging enough without unexpected road closures. Here’s a breakdown of streets currently closed in Manhattan, helping you plan your routes effectively.

Ongoing Closures:

  • East 2nd Street between Avenue C and Bend: Expect full closures on this street from 7 AM to 4 PM, Friday through March 28, 2025. This closure is for associated street work.
  • East 47th Street between Madison Avenue and Vanderbilt Avenue: This street is fully closed nightly from 9 PM to 6 AM until June 30, 2025, for the Grand Central Terminal shed project.
  • East 47th Street between Vanderbilt Avenue and Park Avenue: Similar to the above, expect full closures from 9 PM to 6 AM nightly until June 30, 2025, for the Grand Central Terminal shed project.
  • East 48th Street between Madison Avenue and Park Avenue: Fully closed from 9 PM to 6 AM nightly until June 30, 2025, for the ongoing Grand Central Terminal shed project.
  • Rector Street between Trinity Place and Broadway: This street remains closed 24/7 through March 31, 2025, for utility installations.
  • Riverside Drive (Northbound Service Road) between West 152nd Street and West 153rd Street: This service road is closed 24/7 until March 31, 2025, due to NYCDOT contract HBM1165 rehab work.

Specific Day/Time Closures:

  • West 11th Street between 5th Avenue and 6th Avenue: Closed from 9 AM to 4 PM on Friday, March 16, 2025, for building inspection using a boom truck.
  • West 12th Street between 6th Avenue and 5th Avenue: Expect closures from 8 AM to 4 PM on Saturday, March 16, 2025, also for building inspection via boom truck.
  • West 20th Street between 8th Avenue and 7th Avenue: Closed on weekends (Saturday and Sunday) from 8 AM to 2 PM until March 2, 2025, for crane operations.
  • West 20th Street between 11th Avenue and 10th Avenue: Weekday closures (Monday to Friday) from 9 AM to 3 PM until March 2, 2025, for crane operations.
  • East 21st Street between 3rd Avenue and Gramercy Park West: Weekend closures (Saturday and Sunday) from 7 AM to 4 PM until March 9, 2025, for crane operations.
  • East 21st Street between Lexington Avenue and Gramercy Park West: Weekend closures matching the above, 7 AM to 4 PM on Saturdays and Sundays until March 9, 2025, for crane operations.
  • West 27 Street between 8 Avenue and 7 Avenue: Saturday closures from 8 AM to 6 PM and Sunday from 9 AM to 6 PM until March 8, 2025, for facade repairs using a boom truck.
  • West 28 Street between 8 Avenue and 7 Avenue: Same as above, weekend closures until March 8, 2025, for facade repairs.
  • West 32nd Street between Broadway and 5th Avenue: Night closures on Friday and Saturday nights from 11 PM to 8 AM until March 9, 2025, for crane operations.
  • East 38th Street between Tunnel Approach Street and 1st Avenue: Closed Saturday from 6 AM to 1 PM until March 8, 2025, for concrete pouring.
  • West 43rd Street between 7th Avenue and 8th Avenue: Weeknight closures from 11:30 PM to 6 AM until March 7, 2025, for power washing using a boom truck.
  • East 45th Street between Park Avenue and Lexington Avenue: Friday night to Saturday morning and Saturday night to Sunday morning closures, 10 PM to 9 AM, until March 2, 2025, for crane operations.
  • West 47th Street between 8th Avenue and Broadway: Weekend closures (Saturday and Sunday) from 12:30 AM to 9 AM until March 9, 2025, for escalator delivery.
  • East 48th Street between Madison Avenue and Park Avenue: Friday 7 PM to Monday 6 AM closures until March 7, 2025, for crane operations.
  • East 50th Street between 2nd Avenue and 1st Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 30, 2025, for sewer repairs.
  • West 52 Street between 8th Avenue and 9th Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 23, 2025, for major gas installation.
  • East 53rd Street between Madison Avenue and 5th Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 1, 2025, for sewer service installation.
  • West 64 Street between Broadway and Central Park West: Weekday closures (Monday to Friday) from 7 AM to 6 PM until March 9, 2025, for crane operations.
  • East 68th Street between Madison Avenue and Park Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 2, 2025, for elevator equipment hoisting.
  • East 69th Street between 2nd Avenue and 3rd Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 9, 2025, for building inspection and minor repairs.
  • 86th Street Transverse Road between Central Park West and 5th Avenue: Saturday closure from 8 AM to 4 PM on March 1, 2025, for tree pruning.
  • West 105th Street between Riverside Drive and West End Avenue: Friday closure from 9 AM to 4 PM on March 6, 2025, for crane operations.
  • East 123rd Street between Park Avenue and Lexington Avenue: Weekday (Monday to Friday 8 AM to 5 PM) and weekend (Saturday 8 AM to 6 PM, Sunday 9 AM to 6 PM) closures until March 1, 2025, for crane operations.
  • West 140th Street between Amsterdam Avenue and Hamilton Place: Saturday closure from 8 AM to 4 PM on March 17, 2025, for crane operations.
  • West 167th Street between St. Nicholas Avenue and Audubon Avenue: Friday 9 AM to 4 PM, Saturday 8 AM to 6 PM, and Sunday 9 AM to 6 PM closures until May 31, 2025, for crane, concrete pump, and knuckle boom operations.
  • West 168th Street between Amsterdam Avenue and Jumel Place: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 16, 2025, for associated street work.
  • Jumel Place between West 167th Street and West 168th Street: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 16, 2025, for HVAC hoisting.
  • Jumel Place between West 168th Street and Edgecombe Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 16, 2025, for HVAC hoisting.
  • Edgecombe Avenue between West 167th Street and Jumel Place: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 16, 2025, for HVAC hoisting.
  • Broadway between West 25th Street and Bend: Weekend closures (Saturday and Sunday) from 6 AM to 1 PM until March 8, 2025, for building inspection via boom truck.
  • Baxter Street between Canal Street and Hester Street: Friday closures from 9 AM to 4 PM until April 30, 2025, for concrete pumping and booming.
  • Washington Square East between Washington Place and Washington Square South: Friday closures from 7 AM to 4 PM until March 26, 2025, for special operations including knuckle boom equipment.
  • Greene Street between Spring Street and Prince Street: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 9, 2025, for crane operations.
  • Greenwich Street between Desbrosses Street and Watts Street: Weekday closures (Monday to Friday) from 9 AM to 3 PM for crane operations.
  • Thompson Avenue between West Houston Street and Bleecker Street: Weekday closures (Monday to Friday) from 7 AM to 3 PM until March 16, 2025, for mural painting.
  • Leroy Street between Greenwich Street and Hudson Street: Friday closures from 9 AM to 4 PM until March 2, 2025, for concrete pouring.
  • Franklin Street between Broadway and Franklin Place: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until April 27, 2025, for major gas installation.
  • Franklin Street between Franklin Place and 6th Avenue: Weekend closures matching the above, until April 27, 2025, for major gas installation.
  • Ann Street between Park Row and Theater Alley: Friday 9 AM to 4 PM, Saturday 8 AM to 6 PM, and Sunday 9 AM to 6 PM closures until April 30, 2025, for concrete pumping and material hoisting.
  • Park Avenue (Southbound Side) between East 37th Street and East 38th Street: Weekend closures (Saturday and Sunday) from 5 AM to 5 PM until March 9, 2025, for crane operations.
  • Division Street between Ludlow Street and Orchard Street: Friday closures from 9 AM to 4 PM until March 15, 2025, for building inspection via boom truck.
  • Bedford Street between Grove Street and Barrow Street: Friday closures from 9 AM to 4 PM until March 31, 2025, for hoisting wood and building materials.
  • Jackson Street between Water Street and South Street: Friday closures from 9 AM to 4 PM until March 26, 2025, for east side coast resiliency work.

Major Roadways:

  • FDR Drive between Montgomery Street and East 15 Street: Expect single and double lane closures at various times throughout the week, continuing until August 15, 2026, for median reconstruction. Check specific times in the original article.
  • FDR Drive Southbound between Jackson Street and Cherry Street: Single and double lane closures, particularly on Friday and Sunday nights, until September 11, 2026, for the East Side Coastal Resiliency Project. See original article for detailed times.
  • FDR Drive Service Road between East 30th Street and East 34th Street: Weekend closures (Saturday and Sunday) from 7 AM to 3 PM until March 9, 2025, for crane operations.
  • Battery Park Underpass between FDR Drive and Route 9A/West Street: Periodic full closures of northbound and/or southbound tubes nightly between 11 PM and 4 AM until June 30, 2025, for tunnel maintenance.

Alt Text: A boom truck extends its arm to inspect the facade of a building in Manhattan, indicating ongoing street work and potential closures.

Bronx Street Closures

Stay informed about street closures in the Bronx to navigate your routes effectively. Here’s the latest on Bronx road closures impacting your travel.

Ongoing Closures:

  • Adrian Avenue between West 225th Street and West 227th Street: Weekday closures (Monday to Friday) from 9 AM to 3 PM until February 28, 2025, for Con Ed Vault installation.
  • Park Avenue between East 116 Street and East 117 Street: Nightly closures from 9 PM to 5 AM until March 1, 2025, for Park Avenue viaduct gantry erection.
  • West 225 Street between Terrace View Avenue and Adrian Avenue: Weekday closures (Monday to Friday) from 9 AM to 3 PM until February 28, 2025, for Con Ed vault installation.

Specific Day/Time Closures:

  • East 150th Street between Morris Avenue and Courtlandt Avenue: Friday closures from 9 AM to 4 PM until March 4, 2025, for electric equipment installation.
  • East 153rd Street between Elton Avenue and Melrose Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 28, 2025, for crane operations.
  • East 157th Street between Courtlandt Avenue and Melrose Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 19, 2025, for crane operations.
  • East 158th Street between Elton Avenue and Melrose Avenue: Weekday closures (Monday to Friday) from 9 AM to 2 PM during school sessions and 9 AM to 4 PM during school recess, until March 31, 2025, for booming and pumping operations.
  • West 169th Street between Nelson Avenue and Shakespeare Avenue: Weekday (Monday to Friday 7 AM to 6 PM), Saturday (8 AM to 6 PM), and Sunday (9 AM to 6 PM) closures until April 2, 2025, for knuckle boom and concrete pump operations.
  • West 169th Street between Madison Avenue and Shakespeare Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 1, 2025, for knuckle boom and concrete pump operations.
  • East 181st Street between Jerome Avenue and Walton Avenue: Friday 6 AM to 4 PM, and weekend (Saturday and Sunday) 5 AM to 10 PM closures until March 23, 2025, for mainline track repairs.
  • East 213 Street between Holland Avenue and Carlise Place: Friday closures from 9 AM to 4 PM until March 31, 2025, for crane operations.
  • East 223rd Street between White Plains Road and Carpenter Avenue: Weekday closures (Monday to Friday 8 AM to 6 PM) until April 9, 2025, for boom, knuckle boom, and concrete pump operations.
  • Elton Avenue between East 153rd Street and East 152nd Street: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 28, 2025, for crane operations.
  • Summit Avenue between West 162 Street and West 164 Street: Weekday closures (Monday to Friday) from 9 AM to 3 PM until March 15, 2025, for concrete pump and booming operations.
  • Inwood Avenue between West 169th Street and West Clarke Place: Friday closures from 9 AM to 4 PM until March 5, 2025, for concrete pumps, boom trucks, and knuckle booms.
  • Grant Avenue between East 169th Street and East 170th Street: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 1, 2025, for Grant Park construction.
  • Monroe Avenue between East 173rd Street and East 174th Street: Weekday (Monday to Friday 9 AM to 2 PM) and Saturday (8 AM to 6 PM) closures until March 25, 2025, for operations.
  • Monroe Avenue between Cross Bronx Expressway and East 175th Street: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 26, 2025, for crane operations.
  • Anthony Avenue between East 176th Street and East 175th Street: Friday closures from 9 AM to 4 PM until March 22, 2025, for crane operations.
  • Park Avenue East between East 178th Street and East 179th Street: Weeknight closures (Monday to Friday 9 PM to 5 AM) until March 14, 2025, for water main valve chamber installation.
  • Park Avenue East between East 179th Street and East 180th Street: Weeknight closures matching the above, until March 14, 2025, for water main valve chamber installation.
  • Jerome Avenue between East 181st Street and East Burnside Avenue: Weekend closures (Saturday and Sunday) from 7 AM to 5 PM until March 23, 2025, for mainline track repairs.
  • Tiebout Avenue between East 184th Street and East 187th Street: Friday closures from 9 AM to 4 PM until February 28, 2025, for crane operations.
  • Creston Avenue between East 196th Street and East Kingsbridge Road: Friday closures from 9 AM to 4 PM until April 25, 2025, for crane operations.
  • Cruger Avenue between Sagamore Street and Bronxdale Avenue: Friday closures from 8 AM to 5 PM until March 31, 2025, for MTA contract work zone.
  • Grand Concourse (Service Road Only) between East 177th Street and Tremont Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 1, 2025, for manhole rebuild.

Major Roadways & Bridges:

  • Grand Concourse Bridge over Metro-North Railroad – Hudson Line between 151 Street and 153 Street: Northbound lanes closed weekdays with varying times until March 3, 2025, for structural steel and utility work. Two lanes maintained in each direction.
  • Shore Road Bridge over the Hutchinson River: Single-lane northbound and southbound closures at various times, weekdays and weeknights, until March 24, 2025, for maintenance. One lane maintained in each direction.
  • Hutchinson River Parkway between TBTA Access Road and Schley Avenue: Nightly closures from 10 PM to 6 AM until April 19, 2025, for flood wall installation.
  • Major Deegan Expressway (northbound) between Exit 3 and Entrance ramp north of East 138 Street: Right lane exit only, with additional lane closures at night and weekends until March 3, 2025, for East 138 Street Bridge replacement. Full closures possible at night.
  • Major Deegan Expressway (southbound) between Exit 3 and Entrance ramp south of East 138 Street: Similar to northbound, right lane exit only, additional lane closures, and southbound exit ramp closures at night and weekends until March 3, 2025, for bridge replacement.

Alt Text: A crane lifts materials at a construction site in the Bronx, indicating potential street closures due to construction activities.

Brooklyn Street Closures

Plan your Brooklyn journeys with ease by checking this list of current street closures, ensuring you avoid traffic disruptions.

Ongoing Closures:

  • Rockwell Place between Fulton Street and Dekalb Avenue: Fully closed weekdays 6 AM to 4 PM and weekends 5 AM to 9 PM until March 31, 2025, for MTA rehab.
  • Riverside Drive (Northbound Service Road) between West 152nd Street and West 153rd Street: 24/7 closure until March 31, 2025. (Note: This entry also appears in Manhattan section, likely a data entry error in original source, keeping it as is for accuracy to source).
  • New Dorp Lane between Cedar Grove Avenue and Dead End (Staten Island): 24/7 closure until March 20, 2025, for sewer/watermain construction. (Note: Listed under Brooklyn in original source, likely a data entry error, keeping it as is for accuracy to source but noting Staten Island location.)

Specific Day/Time Closures:

  • 9th Street Bridge over Gowanus Canal: Nightly closures (Monday to Friday 11 PM to 5 AM) and weekend closures (7 AM to 2 PM) intermittently until February 28, 2025, for bridge maintenance.
  • North 6th Street between Kent Avenue and Wythe Avenue: Friday closures from 9 AM to 4 PM until March 30, 2025, for construction work.
  • South 6th Street between Wythe Avenue and Berry Street: Friday closures from 9 AM to 4 PM until April 24, 2025, for concrete pumping.
  • South 6th Street between Bedford Avenue and Berry Street: Friday closures from 9 AM to 4 PM until April 24, 2025, for concrete pumping.
  • 7 Avenue between 36 Street and 37 Street: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 2, 2025, for gas installation.
  • East 9th Street between Kings Highway and Quentin Road: Friday closures from 9 AM to 4 PM until April 30, 2025, for construction work.
  • South 9th Street between Berry Street and Bedford Avenue: Friday closures from 9 AM to 4 PM until April 8, 2025, for construction.
  • 10th Avenue between 48th Street and 47th Street: Weekend closures (Saturday and Sunday 8 AM to 6 PM) until March 9, 2025, for associated street work.
  • 10th Avenue between 49th Street and 48th Street: Weekend closures (Saturday and Sunday 8 AM to 6 PM) until March 9, 2025, for crane operations.
  • 12th Street between 4th Avenue and 5th Avenue: Friday 9 AM to 4 PM, Saturday 8 AM to 6 PM, and Sunday 9 AM to 6 PM closures until April 30, 2025, for hoisting and pumping.
  • North 13th Street between Wythe Avenue and Berry Street: Friday closures from 9 AM to 4 PM until March 16, 2025, for crane operations.
  • 18 Street between 6 Avenue and 5 Avenue: Friday closures from 9 AM to 4 PM until March 15, 2025, for boom truck delivery.
  • East 23 Street between Gravesend Neck Road and Avenue W: Friday closures from 9 AM to 4 PM when school is not in session and 9 AM to 3 PM when school is in session, until April 24, 2025, for major service work.
  • 25 Street between 4 Avenue and 5 Avenue: Friday closures from 9 AM to 4 PM until April 15, 2025, for major service work.
  • East 37th Street between Lenox Road and Clarkson Avenue: Weekend closures (Saturday 8 AM to 6 PM and Sunday 9 AM to 6 PM) until March 2, 2025, for crane operations.
  • 48th Street between 9th Avenue and 10th Avenue: Weekend closures (Saturday and Sunday 8 AM to 6 PM) until March 9, 2025, for associated street work.
  • 48th Street between 10th Avenue and Fort Hamilton Parkway: Weekend closures (Saturday and Sunday 8 AM to 6 PM) until March 9, 2025, for associated street work.
  • 56th Street between 11th Avenue and 12th Avenue: Friday closures from 9 AM to 4 PM until March 6, 2025, for crane operations.
  • 58th Street between 12th Avenue and 13th Avenue: Friday closures from 9 AM to 4 PM until March 26, 2025, for crane operations.
  • 63rd Street between 18th Avenue and 19th Avenue: Friday closures from 9 AM to 4 PM until April 18, 2025, for crane operations.
  • 66th Street between 14th Avenue and New Utrecht Avenue: Friday closures from 9 AM to 4 PM until May 28, 2025, for crane operations.
  • Cortelyou Road between Rogers Avenue and East 28th Street: Friday closures from 9 AM to 4 PM until March 18, 2025, for crane operations.
  • Middleton Street between Harrison Avenue and Marcy Avenue: Weekday closures (Monday to Friday) from 9 AM to 3 PM until March 30, 2025, for construction work.
  • Hope Street between Marcy Avenue and Havemeyer Street: Friday closures from 9 AM to 4 PM until April 26, 2025, for boom placement.
  • Carroll Street between Bond Street and Body of Water: Friday closures from 9 AM to 4 PM until April 30, 2025, for concrete pumping.
  • Pacific Street between 4th Avenue and 3rd Avenue: Friday closures from 9 AM to 4 PM until April 17, 2025, for utility installation and construction work.
  • Linden Boulevard South Service Road between Logan Street and Fountain Avenue: Fully closed Friday from 9 AM to 4 PM until March 17, 2025, for associated street work.
  • Linden Boulevard South Service Road between Logan Street and Milford Street: Fully closed Friday from 9 AM to 4 PM until March 17, 2025, for associated street work.
  • Wyckoff Street between Nevins Street and 3rd Avenue: Saturday closure from 8 AM to 4 PM until March 24, 2025, for crane operations.
  • Sackett Street between 3rd Avenue and Nevins Street: Friday closures from 9 AM to 4 PM until April 29, 2025, for concrete pouring.
  • Nevins Street between Union Street and President Street: Saturday closure from 12 PM to 6 PM until March 10, 2025, for vault installation.
  • Stewart Avenue between Flushing Avenue and Harrison Place: Friday 9 AM to 4 PM, Saturday and Sunday 8 AM to 6 PM closures until April 1, 2025, for crane operations.
  • Taaffe Place between Little Nassau Street and Park Avenue: Friday closures from 9 AM to 4 PM until March 18, 2025, for rebar delivery and concrete pouring.
  • Sackman Street between Fulton Street and Herkimer Street: Friday closures from 9 AM to 4 PM until May 15, 2025, for construction work.
  • Hudson Avenue between Fulton Street and DeKalb Avenue: Friday closures from 9 AM to 4 PM until March 10, 2025, for concrete pumping.
  • State Street between Boerum Place and Smith Street: Friday 9 PM to Saturday 5 PM closures until March 14, 2025, for continuous concrete pouring.
  • Schermerhorn Street between Boerum Place and Court Street: Friday closures from 9 AM to 4 PM until March 17, 2025, for booming and pumping.
  • Essex Street between Atlantic Avenue and Folsom Place: Friday closures from 9 AM to 4 PM until March 16, 2025, for crane operations.
  • India Street between Water and West Street: Weekday closures (Monday to Friday) from 7 AM to 6 PM until May 30, 2025, for large concrete pours.
  • Java Street between Water and West Street: Weekday closures (Monday to Friday) from 7 AM to 6 PM until May 30, 2025, for large concrete pours.
  • Livonia Avenue between Warwick Street and Jerome Street: Weekday (Monday to Friday 7 AM to 6 PM), Saturday (8 AM to 6 PM), and Sunday (9 AM to 6 PM) closures until March 31, 2025, for MTA ADA upgrades.
  • Clark Street between Willow Street and Hicks Street: Friday closures from 9 AM to 4 PM until March 28, 2025, for system relocation.
  • Clark Street between Willow Street and Columbia Heights: Friday closures from 9 AM to 4 PM until March 28, 2025, for system relocation.
  • Snediker between Glenmore Avenue and Liberty Avenue: Weekday (Monday to Friday 9 AM to 5 PM) and Saturday (7 AM to 5 PM) closures until February 28, 2025, for concrete pouring.
  • Sackman Street between Liberty Avenue and Glenmore Avenue: Weekend closures (Saturday and Sunday 9 AM to 5 PM) until May 12, 2025, for crane operations.
  • Osborn Street between Lott Street and Hegeman Street: Friday 9 AM to 4 PM, Saturday and Sunday 9 AM to 5 PM closures until May 26, 2025, for crane operations.
  • Lott Street between Tilden Avenue and Beverly Road: Friday closures from 9 AM to 4 PM until March 30, 2025, for concrete pumping.
  • Withers Street between Humboldt Street and Graham Street: Friday closures from 9 AM to 4 PM until May 23, 2025, for deliveries.
  • Glenmore Avenue between Christopher Avenue and Mother Gaston Boulevard: Friday 9 AM to 4 PM and Saturday 7 AM to 6 PM closures until March 7, 2025, for booming and pumping.
  • Parkside Avenue between Nostrand Avenue and New York Avenue: Friday closures from 9 AM to 4 PM until April 30, 2025, for crane operations.
  • Troutman Street between Wyckoff Avenue and Scott Avenue (St. Nicholas Avenue): Friday 9 AM to 4 PM and/or Saturday and Sunday 9 AM to 5 PM closures until March 31, 2025, for crane operations.
  • Clay Street between Franklin Street and Manhattan Avenue: Friday closures from 9 AM to 4 PM until April 30, 2025, for concrete pumping.
  • Dupont Street between Franklin Street and Manhattan Avenue: Friday closures from 9 AM to 4 PM until April 30, 2025, for concrete pumping.
  • Jefferson Street between Knickerbocker Avenue and Wilson Avenue: Friday closures from 9 AM to 4 PM until April 24, 2025, for project work.
  • Jefferson Street between Wyckoff Avenue and St. Nicholas Avenue: Friday 9 AM to 4 PM, Saturday 8 AM to 6 PM, and Sunday 9 AM to 6 PM closures until March 9, 2025, for crane operations.
  • Wilson Street between Bedford Avenue and Wythe Place: Friday closures from 9 AM to 4 PM until April 25, 2025, for crane operations.
  • Chester Street between Blake Avenue and Dumont Avenue: Weekday (Monday to Friday 9 AM to 5 PM) and Saturday (7 AM to 5 PM) closures until March 31, 2025, for crane operations.

Alt Text: A concrete pump truck extends its boom over a building in Brooklyn, signaling ongoing construction and potential road closures in the area.

Queens Street Closures

Navigate Queens’ streets by staying ahead of planned closures. Here’s a list of current and upcoming street closures in Queens to help you plan your travel.

Ongoing Closures:

  • 126th Street between 34 Avenue and Roosevelt Avenue: 24/7 closure until March 31, 2025, for sewer and watermain installation.
  • Penrod Street between 108th Street and Horace Harding Expressway: Weekday closures (Monday to Friday) from 7 AM to 6 PM until March 31, 2025, for pump station reconstruction.

Specific Day/Time Closures:

  • 24th Street between 41st Avenue and Queens Plaza North: Friday closures from 9 AM to 4 PM until May 20, 2025, for construction work.
  • 29 Street between 30 Drive 31 Avenue: Friday closures from 9 AM to 4 PM until March 7, 2025, for rebar boom deliveries and concrete pumping.
  • 30th Street between 40th Avenue and 39th Avenue: Friday closures from 9 AM to 4 PM until May 6, 2025, for concrete pumping.
  • 40th Avenue between 29th Street and 30th Street: Friday closures from 9 AM to 4 PM until May 6, 2025, for concrete operations.
  • 40th Avenue between Northern Boulevard (31st Street) and 30th Street: Friday closures from 9 AM to 4 PM until May 6, 2025, for concrete operations.
  • 46th Avenue between 11th Street and 21st Street: Weekend closures (Saturday and Sunday 8 AM to 8 PM) until March 9, 2025, for crane operations.
  • 68th Road between Woodhaven Boulevard and Alderton Street/Yellowstone Boulevard: Friday closures from 9 AM to 4 PM until April 9, 2025, for crane operations.
  • 75th Street between 35th Avenue and 34th Avenue: Friday closures from 9 AM to 4 PM for crane operations.
  • 78 Avenue between Austin Street and Kew Forest Lane: Weekday closures (Monday to Friday 9 AM to 3 PM during school sessions) and Friday (9 AM to 4 PM during school recess) until March 2, 2025, for concrete pumping and material delivery.
  • 94th Avenue between Sutphin Boulevard and 148th Street: Friday 9 AM to 4 PM and/or Sunday 9 AM to 5 PM closures until February 28, 2025, for crane operations.
  • Douglas Road between Manor Road and Beverly Road: Friday closures from 9 AM to 4 PM until May 10, 2025, for new building construction.
  • Newtown Avenue between 31st Street and 32nd Street: Friday closures from 9 AM to 4 PM until March 23, 2025, for crane operations.
  • Woodhaven Boulevard Northbound Service Road between Jamaica Avenue and 86th Drive: Weekend night closures (Friday, Saturday, and Sunday 10 PM to 6 AM) until March 17, 2025, for elevator work.
  • Woodhaven Boulevard Northbound Service Road between 89th Avenue and Jamaica Avenue: Weekend night closures matching the above, until March 17, 2025, for elevator work.
  • Intersection between Old South Road and 128 Street: Fully closed weekdays (Monday to Friday) 9 AM to 4 PM until March 5, 2025.
  • Intersection between Old South Road and 129 Street: Fully closed weekdays (Monday to Friday) 9 AM to 4 PM until March 5, 2025.
  • Intersection between Old South Road and 130 Street: Fully closed weekdays (Monday to Friday) 9 AM to 4 PM until March 5, 2025.
  • Rockaway Freeway Eastbound between Beach 59th Street and Beach 56th Street: Weekday (Monday to Friday 7 AM to 6 PM), Saturday (8 AM to 6 PM), and Sunday (9 AM to 6 PM) closures until May 18, 2025, for concrete restoration.
  • Rockaway Freeway Eastbound between Beach 105th Street and Beach 102nd Street: Weekday (Monday to Friday 7 AM to 6 PM), Saturday (8 AM to 6 PM), and Sunday (9 AM to 6 PM) closures until March 21, 2025, for concrete restoration.
  • Rockaway Freeway Eastbound between Beach 108th Street and Beach 106th Street: Weekday (Monday to Friday 7 AM to 6 PM), Saturday (8 AM to 6 PM), and Sunday (9 AM to 6 PM) closures until March 21, 2025, for concrete restoration.
  • Rockaway Freeway Westbound between Beach 102nd Street and Seaside Avenue: Weekday (Monday to Friday 7 AM to 6 PM), Saturday (8 AM to 6 PM), and Sunday (9 AM to 6 PM) closures until March 21, 2025, for MTA ADA upgrades.
  • Rockaway Freeway Westbound between Beach 104th Street and Seaside Avenue: Weekday (Monday to Friday 7 AM to 6 PM), Saturday (8 AM to 6 PM), and Sunday (9 AM to 6 PM) closures until March 21, 2025, for MTA ADA upgrades.
  • Rockaway Freeway Westbound between Beach 108th Street and Seaside Avenue: Weekday (Monday to Friday 7 AM to 6 PM), Saturday (8 AM to 6 PM), and Sunday (9 AM to 6 PM) closures until March 21, 2025, for concrete restoration.

Major Roadways & Bridges:

  • Ed Koch/Queensboro Bridge: Lane closures on the Manhattan-bound ramp and Lower Roadway at various times, nights and weekends, until March 8, 2025, for upper deck replacement. Vehicles over 13’ restricted. See original article for specific times.
  • 130 Avenue Bridge over Belt Parkway: Single-lane north side and sidewalk closures weekdays and weekends until March 8, 2025, for bridge rehabilitation. One lane maintained in each direction.
  • Belt Parkway between Exit 21B and Exit 20: Single and double lane westbound closures at various times, weekdays and weekends, until December 31, 2025, for JFK Redevelopment Program. See original article for specific times.
  • Grand Central Parkway at Long Island Expressway Interchange: Single and double lane eastbound and westbound closures at various times, weekdays and weekends, until April 23, 2026, for Safety and Mobility Improvements. See original article for specific times.
  • Grand Central Parkway Eastbound between Roosevelt Avenue and 54 Avenue: Mainline closures for 15 minutes at a time, weekdays and weekends, until April 23, 2026, for sign structure work. Shoulder lane closed 24/7. See original article for specific times.
  • Grand Central Parkway Eastbound CD Road at Exit 10 between Westbound Long Island Expressway Entrance Ramp and Eastbound Grand Central Parkway Exit 10E Ramp: Single-lane closures at various times, weekdays and weekends, until March 31, 2025, for Safety and Mobility Improvements. See original article for specific times.
  • Hillside Avenue Bridge over Cross Island Parkway: Single and double lane closures in either direction at various times, weekdays and weekends, until March 8, 2025, for underdeck repairs. See original article for specific times.
  • Nassau Expressway between Cross Bay Boulevard Entrance Ramp and Exit 2N: Single and double lane eastbound closures, and Eastbound Exit Ramp 2S closures at various times, weekdays and weekends, until December 31, 2025, for JFK Redevelopment Program. See original article for specific times.
  • Van Wyck Expressway: Single and double lane closures in both directions at various times, weekdays and weekends, until July 14, 2025, for roadway widening. Ramps may also be closed. See original article for specific times.
  • Springfield Boulevard Bridge over Belt Southern Parkway between North Conduit Avenue and South Conduit Avenue: Center median and single lane closures in each direction, weekdays and weeknights until March 28, 2025, for eastern sidewalk rehabilitation.

Alt Text: An aerial view showcases the street grid of Queens with cars moving, highlighting the importance of street closure information for navigating the borough.

Staten Island Street Closures

For those in Staten Island, staying informed about street closures can significantly ease your commute. Here’s what’s closed on Staten Island streets.

Ongoing Closures:

  • New Dorp Lane between Cedar Grove Avenue and Dead End: 24/7 closure until March 20, 2025, for sewer/watermain construction. (Note: This entry also appears in Brooklyn section, likely a data entry error in original source, keeping it as is for accuracy to source).
  • Front Street between Wave Street and Hannah Street: Weekday closures (Monday to Friday 7 AM to 6 PM) and Saturday (8 AM to 4 PM) until March 23, 2025, for Stapleton Waterfront Infrastructure work.

Alt Text: The Staten Island Ferry approaches the Manhattan skyline, representing commutes between boroughs and the importance of traffic information across NYC.

Festival, Parade, and Event Street Closures

Beyond planned construction, NYC’s vibrant event schedule also leads to temporary street closures. Here’s a look at upcoming event-related closures:

Manhattan:

  • 2025 NYRR Washington Heights Salsa Blues & Shamrock’s 5K (March 2, 2025): Various streets in Washington Heights will be closed at the discretion of the NYPD for this event. Check the original article for a detailed list of formation, route, and dispersal streets.

Queens:

  • Queens County St. Patrick’s Day Parade (March 1, 2025): Streets in Queens, particularly in the Rockaway area, will be closed for the parade. See the original article for formation, route, and dispersal details.
  • St. Pats For All Parade (March 2, 2025): Streets in Sunnyside and Woodside, Queens, will be closed for this parade. Refer to the original article for specific street closures related to formation, route, and dispersal.

Staten Island:

  • Richmond County St. Patrick’s Day Parade (March 2, 2025): Streets in Staten Island, primarily in the Forest Avenue area, will be closed for the parade. Check the original article for details on formation, route, and dispersal streets.

Stay Updated with Streetsounds.net

Street closures in NYC are subject to change, and new closures can be announced daily. For the most accurate and real-time updates, always refer back to streetsounds.net. We strive to provide you with the latest information to help you navigate New York City streets with confidence.

Source: MTA Bridges and Tunnels Scheduled Maintenance and Construction

Comments

No comments yet. Why don’t you start the discussion?

Leave a Reply

Your email address will not be published. Required fields are marked *